fbpx

Rectification & Demolition

Clearing Stucked Concrete within a 14-metre Pipe (MRT)

Project Reference Clearing Stucked Concrete within a 14-metre Pipe (MRT) The Challenge One of the MRT Water Down Pipe was clogged with concrete and water can’t flow through. The Concrete has to be cleared through the 200mm pipe at a length of 14m. Our Approach & Result As no drill and hacking tools can fit …

Clearing Stucked Concrete within a 14-metre Pipe (MRT) Read More »

×