fbpx

Upgrading, Refurbishment & Reinstatement

Removal of Tower Crane Foundation

Project Reference Removal of Tower Crane Foundation The Challenge Tower Crane is vital for high rise building projects, therefore the Tower Crane Foundation is designed with heavily reinforced concrete to ensure the safety. Almost to the end phase of the project, the tower crane base needs to be removed. Basement level has limited access and height …

Removal of Tower Crane Foundation Read More »

Sunway Pyramid Extension Bridge Demolition

Project Reference Sunway Pyramid Extension Bridge Demolition The Challenge The link bridge that connects Sunway Pyramid Shopping Center and Sunway Hotel was closed for major demolition works for the new extension of the shopping center. Sonicon was contracted with works involved of removing roof slab, parapet wall and staircase cutting of more than 350mm concrete …

Sunway Pyramid Extension Bridge Demolition Read More »

Improving Tunneling Works’ safety and productivity with Demolition Robot

Project Reference Improving Tunneling Works’ safety and productivity with Demolition Robot The Challenge With their compact size, Demolition Robot can perform tremendously well especially for tunneling industry. A new passageway was created to the existing Smart Tunnel, the limestone and rocks has to be cleared during this process. In tunneling works, working access is generally …

Improving Tunneling Works’ safety and productivity with Demolition Robot Read More »

Renaissance Hotel Upgrading Works

Project Reference Renaissance Hotel Upgrading Works The Challenge Renaissance Hotel is a 5-star hotel located in the heart of the city Kuala Lumpur, belongs to Marriott Group. This hotel has rich history and legacy in the city that serve the perfect venue to host social events to large-sized conventions and meetings. This 25-year-old hotel is …

Renaissance Hotel Upgrading Works Read More »

Demolition Robot crack Jewellery Strongroom

Project Reference Demolition Robot crack Jewellery Strongroom The Challenge A jewelry shop building which has operated more than 30 years in KL was undergoing some renovation. The client supposed to deploy a mini-excavator to demolish the strongroom, only to realize it is not able to enter the premise because of its size. Sonicon was assigned …

Demolition Robot crack Jewellery Strongroom Read More »

×