Upgrading, Refurbishment & Reinstatement

Ikano Damansara Refurbishment | Sonicon Construction

Ikano Damansara Refurbishment

Project Reference Ikano Damansara Refurbishment The Challenge In 2017, Sonicon was honored to be appointed as the Controlled Demolition Specialist for Ikano Damansara project. We were assigned for a major refurbishment project that involve a high level of precision, control and safety works. Our Approach Our goal was to ensure the work can be done …

Ikano Damansara Refurbishment Read More »

Renaissance Hotel | Upgrading, Refurbishment & Reinstatement | Sonicon Construction

Machinery Installation Preparation in HICOM Proton Plant

Project Reference Machinery Installation Preparation in HICOM Proton Plant Hicom Teck See Mann (M) Sdn Bhd, located in Tanjung Malim, Perak is a new factory that manufacturers bumpers for Proton cars. To accommodate their new injection moulding equipment, the client requested us to make openings to install their oil flow groove system. The job assigned …

Machinery Installation Preparation in HICOM Proton Plant Read More »

Amerin Mall — Malaysia First Reinstatement Works with Robot & Semi Automated Equipment | Robotic Demolition | Parana Milling | Concrete Floor Tile Scraper | Sonicon Construction

Amerin Mall — Malaysia First Reinstatement Works with Robot & Semi Automated Equipment

Project Reference Amerin Mall Malaysia First Reinstatement Works with Robot & Semi Automated Equipment The Challenge A supermarket in a shopping mall needs to be reinstated by demolishing cold room raised slab, walls, remove tiles and screed to prepare for the upcoming anchor tenant fast. While the shopping mall is still operating, work method must …

Amerin Mall — Malaysia First Reinstatement Works with Robot & Semi Automated Equipment Read More »

Control Cracks with Contraction Joints | Diamond Joints Cutting | Sonicon Construction

Control Cracks with Contraction Joints

Project Reference Control Cracks with Contraction Joints The Challenge A new terrace shoplots project has completed recently. To avoid from random cracks along the slabs, control joint should be formed as soon as possible. To control concrete from cracking randomly, client has appointed Sonicon to place contraction joints along the shoplots slabs. Contraction joints can …

Control Cracks with Contraction Joints Read More »

×