fbpx

Project Reference

Clearing Stucked Concrete within a 14-metre Pipe (MRT)

The Challenge

One of the MRT Water Down Pipe was clogged with concrete and water can’t flow through. The Concrete has to be cleared through the 200mm pipe at a length of 14m.

Our Approach & Result

As no drill and hacking tools can fit in such small space with great length, Sonicon Diamond Coring is used for this job to core inside the pipe. Sonicon customized and extended tube barrel to go deeper than 14-metre. The clogged concrete was then removed, and water can flow through smoothly.

Professional Advice

×