In the LRT2 Extension project from Kelana Jaya to Putra Heights, Selangor, Sonicon was given a special assignment to core openings of 1,058 holes of 100mm diameter x 150mm depth on steel fibre concrete slab with a comprehensive strength of at least 50N/mm2 (Grade 50), how fast can we core? With our well-trained operators and efficient 4 coring machines working onsite, Sonicon managed to complete the job within 4 days only.
In other package of the same project, Sonicon was tasked to core 6000+ holes of 42mm and 35mm dia holes for anchor installation purposes for their rail works.