Project Reference

Amerin Mall

Malaysia First Reinstatement Works with Robot & Semi Automated Equipment

The Challenge

A supermarket in a shopping mall needs to be reinstated by demolishing cold room raised slab, walls, remove tiles and screed to prepare for the upcoming anchor tenant fast. While the shopping mall is still operating, work method must be efficient enough to ensure other shops will not be affected during the whole process.

Our Approach

As this is the first time in Malaysia deploying equipment and robotics in demolition works, Sonicon aim to revolutionize, revamp and change the way upgrading and refurbishment works are done in construction jobsite. Hence, Sonicon deployed Robotic Breaker, Parana Milling and Semi Automated Battery Ride On Battery Scrapers to execute the works, replacing the old conventional labour intensive methods.

The Result