The Challenge

A jewelry shop building which has operated more than 30 years in KL was undergoing some renovation. The client supposed to deploy a mini-excavator to demolish the strongroom, only to realize it is not able to enter the premise because of its size. Sonicon was assigned on the last minute to demolish the structure within 2 days!

Our Approach

A strongroom is designed to store valuables, concrete used is heavily reinforced with high compression strength. With ceiling height of less than 9 feet, hacking job of 20 working men has been replaced with a Demolition Robot. It can enter the shop with ease and no combustion during hacking process. With fewer than 4 working men, Sonicon managed to hack the concrete walls and rebar in 1 day!

Professional Advice

×