The Challenge

Tower Crane is vital for high rise building projects, therefore the Tower Crane Foundation is designed with heavily reinforced concrete to ensure the safety. Almost to the end phase of the project, the tower crane base needs to be removed. Basement level has limited access and height for excavators or backhoe.

Our Approach

Hence, Sonicon deployed a combination of Robotic Hacking and Diamond Wire Sawing method as a part of the demolition solution. The base isolated from the existing column by Wire Saw, and the concrete and rebars were hacked and cut while the debris was removed with skid loader, making the work more productive.

3 Tower Crane base were demolished efficiently with our advanced demolition solution, deliver high quality of services to bring satisfaction to our clients. Job was completed within the time frame of 1 month.